Project Name. MIRPURE NEW CITY DEVELOPMENT MDR-24 / MDR-25 / MDR-34
Location. Mirpure – Pakistan
Client WAPDA

Scope of Work.

  • Total Area of Scheme = 40,000 (Kanals)
  • Total Development Area = 24,000 (Kanals)
  • Length of Road
  • Network = 86 KM
  • Length of Drainage Channels = 91 KM
  • Length of Drainage Pipes = 87 KM
  • Length of W/S Pipes = 600,000 R. Ft
  • Length of Sui Gas = 86 KM
  • Length of Electrical Network = 86 KM
  • U/G Water Tanks = 200,000 Gallon x 22 Nos.
  • O.H Water Tanks = 100,000 Gallon x 22 Nos.
  • Sewage Treatment Plant = 40 M.G.D x 2
  • Total No of Plots in Scheme = 4000 Nos.
  • 2 Kanal Plots = 1250 Nos.
  • 1 Kanal Plots = 1000 Nos.
  • 10 Marla Plots = 500 Nos.
  • 5 Marla Plots = 500 Nos.