Current Projects
Local Projects
Power & EnergyPetrochemicals
Road & Infrastructure
Buildings
Water Resources Engineering
Air Ports & Aviation
Environmental
Executed Projects
Local Projects
Power & EnergyPetrochemicals
Road & Infrastructure
Buildings
Water Resources Engineering
Environmental
Air Ports & Aviation
Oil & Gas
Project Name. MIRPURE NEW CITY DEVELOPMENT MDR-24 / MDR-25 / MDR-34
Location. Mirpure – Pakistan
Client WAPDA
Scope of Work.
- Total Area of Scheme = 40,000 (Kanals)
- Total Development Area = 24,000 (Kanals)
- Length of Road
- Network = 86 KM
- Length of Drainage Channels = 91 KM
- Length of Drainage Pipes = 87 KM
- Length of W/S Pipes = 600,000 R. Ft
- Length of Sui Gas = 86 KM
- Length of Electrical Network = 86 KM
- U/G Water Tanks = 200,000 Gallon x 22 Nos.
- O.H Water Tanks = 100,000 Gallon x 22 Nos.
- Sewage Treatment Plant = 40 M.G.D x 2
- Total No of Plots in Scheme = 4000 Nos.
- 2 Kanal Plots = 1250 Nos.
- 1 Kanal Plots = 1000 Nos.
- 10 Marla Plots = 500 Nos.
- 5 Marla Plots = 500 Nos.