Current Projects
Local Projects
Power & EnergyPetrochemicals
Road & Infrastructure
Buildings
Water Resources Engineering
Air Ports & Aviation
Environmental
Executed Projects
Local Projects
Power & EnergyPetrochemicals
Road & Infrastructure
Buildings
Water Resources Engineering
Environmental
Air Ports & Aviation
Oil & Gas
Location: Islamabad, Pakistan.
Client: Capital Development Authority
Scope of Work:
Construction of :
Pumping station, Administration Building (old), Sludge Thickener, Sludge Stabilisation Tank, Drying Bed Pumping Station, Sludge Drying Beds, Sludge Area, Administration Building (new), Coarse Screen, Pretreatment, Primary Settler, Primary Sludge Pumping Station, Active Sludge Tank, Deaerator and recirculation sludge pumping station, Clarifier, Flow measurement – service water, electrical building.
- RCC Pipe 1200, 800, 600 mm Ø 1200 m length.
- Fiber Glass pipe Ø 800, 600, 500, 450 – 3500 M.
- MS Pipe Ø 1400, 450, 150- 1900 M.
Excavating of mechanical equipment. - Excavation at pumping station up to 60 ft. down involving dewatering.
1. Laying & Jointing of RCC Pipe Ø 1200, 800 & 600 mm. Total length 2200 m.
- PVC pipe Ø 300, 200, 100 & 50 mm.
- PE Pipe Ø 90’, 160’ mm for water supply networking.
- M.S Pipe 1400, 1100 mm Ø, nullah crossing.
- Fiber glass 800, 600, 500, 450 mm Ø, length 3500 M.
- 3. Manhole of RCC line, chambers & interceptors