Location: Lalpir, Pakistan
Client: AES

Scope of Work.

  • Gas turbine house
  • Control room buildings
  • Steam Turbine Halls
  • Generator foundation
  • Switch yard
  • Water treatment plant
  • Cooling tower
  • Ancillary structures for balance of plant
  • Water intake structure
  • Drainage system
  • 150m High Concrete batched and placed = 112,000M3
  • Steel structure fabricated and erected = 4000 tons