Location: Bin Qasim, Karachi
Client: Fauji Fertilizer Company
Scope of Work.
- Construction of Urea Plant
- Raw Material Storage
- Cooling Tower
- Natural Gas Station
- Pipe Racks
- Control Room and Electrical Sub-Station
- Gas Pipeline sleepers
- Prilling Tower
- Infrastructure
- Buildings (Multifunction)
- Control Rooms
- Earthwork & Excavation = 500,000 M3
- Leveling & Grading = 350,000 M3
- Concrete = 129,000 M3
- Graveling = 350,000 M3
- Form piping (approximate in an area of 750 Acers)
- Plants roads area = 95,000 M3