Location: Sawan Gas & Oil Field, Chundko, Pakistan
Client: OMV

Scope of Work.

  • Total length of Road = 23 Km
  • Embankment Cut = 118,000 M3
  • Up-grade preparations = 343,00 M2
  • Gravel Sub-base (150 mm) = 314,000 M2
  • Prime coat = 185,000 M2
  • 50 mm Dence Graded AC = 14 18,500 M2
  • Pavement Marking = 23,500 m
  • RCC Pip Culverts = 670 m